Chapter 16

Plant Floor Machinery

Alexander Spivak, Ashok Kumar and Matthew Franchetti

Abstract

Engineers typically make plant machinery’s economic replacement decisions. Such decisions involve cost analysis, which allow determining when the current machine is to be replaced with a new one. A manager’s job may be to suggest when such analysis should be conducted, especially on older machines, and when production changes occur.

Total Pages: 81-83 (3)

Purchase Chapter  Book Details

RELATED BOOKS

.Solar Thermal Systems: Thermal Analysis and its Application.
.Image Processing in Renewable Energy Resources: Opportunities and Challenges.
.Vertical Axis Hydrokinetic Turbines: Numerical and Experimental Analyses.
.Systematic Architectural Design for Optimal Wind Energy Generation.
.Occupant Behaviour in Buildings: Advances and Challenges.
.Numerical Methods and Implementation in Geotechnical Engineering – Part 2.
.Numerical Methods and Implementation in Geotechnical Engineering – Part 1.
.Bio-Inspired Materials.